UC Santa Barbara                                      Policy 5521
  Policies                                              
  Issuing Unit:  Physical Plant Department              Date: July 1, 1973
  
  
  
  
                         UNDER REVISION
                  CONTACT FACILITIES MANAGEMENT
                                
                   DEPARTMENT-FUNDED SERVICES
                  AND ALTERATIONS OR ADDITIONS
                     TO EXISTING FACILITIES
  
  I.   PURPOSE AND SCOPE:
  
       This procedure describes the services which are chargeable to
       departments and indicates how the departments may avail themselves
       of the services.
  
  II.  REFERENCES:
  
       A.UCSB Policies Manual, Policy 5518, Physical Plant Department
            Funded Services.
       
  III. PROCEDURE:
  
       A.   Responsibility:
       
            1.   Services, alterations, or additions to assigned facilities
                 which have not been scheduled for funding through one of
                 the alternate channels (see UCSB Policy 5518) shall be
                 financed by the initiating department and such funds shall
                 be anticipated in the department's annual detailed budget
                 submittal.
            
            2.   Repairs on, or the maintenance or moving of departmental
                 equipment, and setups for special events are chargeable to
                 the initiating department. Departmental equipment is
                 defined as that equipment which is inventoried to the
                 department.
            
            3.   Any project which changes the basic function of a
                 building, which alters the floor plan, or which affects
                 the aesthetics of the structure or the campus in general,
                 shall receive prior Physical Planning Committee approval.
                 Requests (Work Orders) should be submitted to the Physical
                 Plant Committee via the Chairman of the Space
                 Subcommittee.
            4.   Where indicated, the Physical Plant Department (PPD) will
                 request the services of the Office of Architects &
                 Engineers for architectural plans and specifications,
                 mechanical, electrical, and structural engineering
                 services and aesthetic considerations.
            
       B.   Work Approval:
       
            Requisitions for Services on Work Order forms shall bear the
            signatures of approval by the chairman or other authorized
            person(s) of the department before the order will be processed.
       
       C.   Projects $100 or Less:
       
            1.   U.C. Physical Plant Work Order Form 9735: Work orders
                 which cost $100 or less per project should be issued under
                 a Departmental Blanket Account with Physical Plant. Once
                 the blanket account has been established, work orders,
                 under $100 per order, are chargeable to this account and
                 should be submitted to the Physical Plant Department on
                 work order form 9735. A Work Order Number is assigned by
                 Physical Plant Department.
            
            2.   Estimates: Estimates or itemization of costs would not
                 normally be submitted by the Physical Plant Department for
                 projects under the blanket order procedure. Where detailed
                 estimates only are required, the U.C. Physical Plant Work
                 Order may be used for the request.
            
            3.   Scheduling: Work can start immediately on blanket orders
                 received by the Physical Plant Department in that no lien
                 is required, and the department is held responsible for
                 available funds.
            
       D.   Projects over $100:
       
            1.   U.C. Physical Plant Requisition Form 9734: Work requests
                 for projects over $100 should be submitted on U.C.
                 Physical Plant Requisition. All data on the form should be
                 completed.
            2.   Liens of Funds: Projects of this classification shall have
                 the funds liened by the Accounting Department before work
                 can start.
            
            3.   Estimates: Estimates of costs for budgetary purposes and
                 future planning will be furnished at cost upon request,
                 but it must be understood that estimates are not firm
                 bids. All monies unexpended, regardless of amount, are
                 returned or credited to departmental budgets. Conversely,
                 overdrafts to the original lien must be approved for
                 payment by the department, in writing, by sending an
                 "Authorization of Increase" to the Accounting Department
                 with reference to the specific requisition order, and a
                 carbon copy sent to the Physical Plant Department.
            
            4.   Scheduling: Scheduling of manpower and the procurement of
                 materials involves varying periods of lead time which PPD
                 will include in an estimated completion date, upon
                 submittal of its cost estimate to the department.
            
            5.   Physical Plant Requisition Work Order Number: A work
                 request number is assigned by PPD. All copies of the
                 Physical Plant Requisition should be forwarded to the
                 Physical Plant Department for processing; the departmental
                 copy (goldenrod in color) will be returned expeditiously
                 to the initiating department for its files, after Physical
                 Plant has assigned an order number.
            
       E.   PPD modifications to space will be completed in the same
            finish, quality, and workmanship of the surrounding structure.
       
       F.   PPD will forward copies of As-Built Drawings to A&E for any
            modification which changes the floor plan of a room or
            building.
  
  
  IV.  ATTACHMENTS:
  
       A.   Physical Plant Requisition
  



For questions or comments regarding the format of the above information, please contact webcontact@ucsbuxa.ucsb.edu.


Last Modified By: HMW, 5/21/97